Top-Floor 3-Bedroom Sea View Apartment at Deniz Istanbul
A vacant top-floor 3-bedroom resale apartment with full panoramic sea views in Deniz Istanbul’s Mercan Konakları phase.
A huge plot of 260,000 sqm for just 144 luxury villas, all with private pools in the "Tuscany" of Istanbul - Buyukcekmece.
Browse all property for sale in Buyukcekmece .
These beautifully crafted Single-storey and duplex villas are set in the heart of the sleepy village in Buyukcekmece – Istanbul’s “Tuscany”. These are beautifully crafted villas in every way. Set on a huge 260,000 sqm of land, there is plenty of space set aside for just the 144 villas that are available.
Two types of villa are available, 6 bed and 7 bed with sizes ranging from 768 to 841 sqm. Each villa comes equipped with a private pool, and a detached garden of 1300 sqm to 2500 sqm. All villas are equipped with smart home systems.
This villa compound is set in Buyukcekmece with completion planned for December 2022. All amenites are close by, with the new airport just 20 minutes away. Private hospitals, colleges, shopping centres, and educational institutions are all within a 10 minute radius. Access to downtown Istanbul is relatively simple, via the TEM (E6) highway.
Approximate straight-line distances, not walking or driving distances. Local places: within 3.5 km; Marmaray and Metrobüs: within 500 m. Airports: within 150 km.
No nearby places recorded in this category.
Map data: © OpenStreetMap contributors (ODbL).
Airport reference coordinates: OurAirports (public domain)
Final pricing is subject to negotiation with the seller and contract.
| Type | Gross size | Price |
|---|---|---|
| 6+1 | 769 m² | $1,300,000 |
Whether you’re buying, selling, or renting in Istanbul, our team can walk you through the numbers, the legal steps, and the neighbourhoods that fit your strategy.
Get a free valuation and see how Pera can market your property to local and international buyers, or let us manage your Istanbul rental with hands-on owner support.
Ask about availability, pricing, floor plans, or arrange a viewing.